-
Demolition of existing buildings.
-
Cut and fill of site, import of 12,000 tones of rubble material.
-
Level and compacted to level 1 standard.
-
Construction of retaining walls 4m high.
-
Excavation of tank and stormwater holes.
-
Trimming of the site for concrete works.